Creation of a New Basin Used to Cool the Manufacturing Equipment at the LNG Plant.

Summary of the project

The Zueitina Oil Company update cooling creates a new basin sedimentation and storage of sea water system before pumping it through pipes to cool manufacturing equipment in the gas plant. Focus on the basin water pumps and rotating equipment in addition to the leaching unit of copper and chlorine compounds lethal to aquatic organisms outstanding.

This project aims to several benefits: - including improving the deposition of sea water, improve water quality and increase the amount of pumping in anticipation of the increase in production.

The company implemented

Zueitina company contracted with the Dutch company Antrepetton to put all needed for the project and create it and buy all of the project requirements Mak.cah and electrical equipment and machines accurate engineering designs

Duration of the project

Olainchaiah began work on this project in September 2009 and is expected to be completed in the month of April 2011 and will be placed in service in May 2011.

Phases of the project

The following images show the stages of the project.